How does Kanban differ from Scrum?

Options

  1. Kanban limits WIP and flows; Scrum uses sprints (Correct option)
  2. They are identical in the way that they work
  3. Kanban has fixed sprints, while Scrum does not
  4. Kanban is only used for hardware engineering

Answer

Kanban uses a visual board, limits work in progress (WIP) and flows continuously without fixed sprints; Scrum works in timeboxed sprints with defined roles and events

Why

Kanban columns show states (To do, In progress, Review, Done). The key rule is WIP limits: a maximum number of items in each column, so you finish work before starting new work, exposing bottlenecks.

No mandatory sprint or roles; changes can be added any time. Metrics: lead time and cycle time.

Support and maintenance teams often prefer Kanban; product teams often use Scrum. Many teams mix them ("Scrumban").

Remember

Kanban = continuous flow + WIP limits. Scrum = timeboxed sprints.